Option 0 is adjacent to DB room and would require a charger with 10m of charge lead
the installation lead very much reduced.

Distance DB to Option 1 10m
Distance DB to Option 2 15m


Main supply in on left. Other supply is to the induction hob.
Drainage gap could accept an earth rod or even between cables.

 

There is spare way at end of rail also 3rd one along from right is not used
so CB can be replaced.

Gas and Elec meters in cupbord under stairs housing DB
Height at DB allows person to stand not kneel

 

Left picture DB wall and for Option 0 in the space inside behind bin
Right picture Return wall Option 1 EV charger point


Left picture route under eves over or under black store door
Right picture Option 2 EV point